Funding for new windows
Official name: Prepare Vienna window funding for your own home
The City of Vienna can support new windows in your home with money. This is called funding (Förderung). This plan helps you organise the quote, consent and proof for the application.
No account · Answers stay in your browser
- Steps
- 7 key steps, up to 14 depending on your situation
- For you
- 5 short questions, then you see your steps
- Main office
- MA 50
- Costs
- none named in the sources
- Online
- possible for 6 of 14 steps
How it works
These are the key steps, in the right order. Answer the short questions; then you see exactly what applies to you and what is added.
Check that it is only about windowsThis is only about funding for windows in your home. Other work, such as electrics or bathrooms, has its own programmes.Key step
- Why?
- MA 50 is the city office for housing funding. It decides on the funding.
- What you do
- You have no fixed right to money. The funding also depends on how much money the city has for it.
- Where?
- MA 50 / MA 25Directly with the named service
In detail
Identify actual window funding rather than general renovation
Only your professionally confirmed apartment route. Other electrical, sanitary, detached-home or building renovations are separate programmes. MA 50 determines recognised costs and funding, with no legal entitlement and budget limits.
SourceSchall-/Wärmeschutzfenster: Förderantrag
Schall-/Wärmeschutzfenster: FörderantragStadt Wien · MA 50 · retrieved on 11/10/2026
Open original sourceCheck if your home and windows qualifyHere you find out if your home and your windows fit. Your main residence is where you mainly live.Key step
- Why?
- The app cannot work out whether you will get the funding.
- What you do
- Talk to the city's information point (Infopoint). Clarify your residence, home, building and the planned work.
- Where?
- MA 50 / MA 25Directly with the named service
In detail
Obtain qualified clarification of an unconfirmed apartment or window route
Agree main residence, actual apartment or building conditions, measures and tenure with the information point. Calculate no funding eligibility from apartment size, street or app selection.
SourceSchall-/Wärmeschutzfenster: Förderantrag
Schall-/Wärmeschutzfenster: FörderantragStadt Wien · MA 50 · retrieved on 11/10/2026
Open original sourceCheck what the windows must doSound-protection windows keep noise out. Thermal-protection windows keep warmth in. MA 25 is the city's technical office.Key step
- Why?
- The windows must meet certain technical rules. An authorised specialist company must install them. Doing it yourself does not count here.
- What you do
- Clarify all windows of your home with the company or MA 25. On main roads there are special rules for noise protection. Have the current rules confirmed.
- Where?
- MA 25 / befugte FachfirmaDirectly with the named service
In detail
Directly confirm technical window requirements
Clarify all apartment windows and an authorised contractor; self-performed work or material-only costs are not this funding route. Main roads A/B require an appropriate sound-protection route, with corner apartments reviewed individually. HTML and current regulation references differ on thermal requirements: directly confirm the current technical specification with contractor or MA 25, no app U-value test.
SourceSanierungs- und Dekarbonisierungsverordnung: relevanter § 18
Sanierungs- und Dekarbonisierungsverordnung: relevanter § 18RIS · Wiener Landesrecht · retrieved on 11/10/2026
Open original sourceGet the owner's consentConsent means the owner of the home agrees. If you rent, you ask your landlord. In a municipal flat (Gemeindewohnung) you ask Wiener Wohnen.Key step
- Why?
- Without consent the application does not work. If you own the home, you show this with the land register (Grundbuch). That is an official list of owners.
- What you do
- Get the consent or the proof. But the consent is not yet funding and not a building permit.
- Where?
- MA 50 / EigentümerDirectly with the named service
What you need
- Actual landlord or Wiener Wohnen consent
Document explained · Depends on your case
Only the appropriate rented or municipal apartment route.
- Requirement
- Required when applicable
- Submission format
- Clarify format with the service
- Translation
- No specific rule recorded; clarify foreign-language records with the service.
- Authentication
- No specific rule recorded; clarify need before obtaining records.
- Recency
- No fixed age limit recorded; clarify currency with the service.
SourceWohnungsverbesserung: Vermietererklärung
Wohnungsverbesserung: VermietererklärungStadt Wien · MA 50 · retrieved on 11/10/2026
Open original source - Actual ownership or land-register evidence
Document explained · Depends on your case
Directly review currently accepted evidence.
- Requirement
- Required when applicable
- Submission format
- Clarify format with the service
- Translation
- No specific rule recorded; clarify foreign-language records with the service.
- Authentication
- No specific rule recorded; clarify need before obtaining records.
- Recency
- No fixed age limit recorded; clarify currency with the service.
SourceSchall-/Wärmeschutzfenster: Förderantrag
Schall-/Wärmeschutzfenster: FörderantragStadt Wien · MA 50 · retrieved on 11/10/2026
Open original source
In detail
Organise appropriate consent or ownership evidence
Rented apartment: actual landlord or manager consent; municipal apartment: Wiener Wohnen; ownership: actual land-register inspection or evidence. Consent is no funding assurance or building permit.
SourceWohnungsverbesserung: Vermietererklärung
Wohnungsverbesserung: VermietererklärungStadt Wien · MA 50 · retrieved on 11/10/2026
Open original sourceCollect quote, invoices and certificateHere you gather proof. That is a detailed quote or invoices. You also need a certificate from the company.Key step
- Why?
- The certificate shows that the windows meet the minimum rules.
- What you do
- Are you still planning? Then the quote is enough. Ask the office in which form it wants the proof.
- Where?
- MA 50 / FachfirmaDirectly with the named service
What you need
- Itemised professional quote
Document explained · Depends on your case
Only the actual quote route.
- Requirement
- Required when applicable
- Submission format
- Clarify format with the service
- Translation
- No specific rule recorded; clarify foreign-language records with the service.
- Authentication
- No specific rule recorded; clarify need before obtaining records.
- Recency
- No fixed age limit recorded; clarify currency with the service.
SourceSchall-/Wärmeschutzfenster: Förderantrag
Schall-/Wärmeschutzfenster: FörderantragStadt Wien · MA 50 · retrieved on 11/10/2026
Open original source - Actual appropriate invoices
Document explained · Depends on your case
Directly review individual six-month and recipient requirements.
- Requirement
- Required when applicable
- Submission format
- Clarify format with the service
- Translation
- No specific rule recorded; clarify foreign-language records with the service.
- Authentication
- No specific rule recorded; clarify need before obtaining records.
- Recency
- No fixed age limit recorded; clarify currency with the service.
SourceSchall-/Wärmeschutzfenster: Förderantrag
Schall-/Wärmeschutzfenster: FörderantragStadt Wien · MA 50 · retrieved on 11/10/2026
Open original source - Actual professional minimum-requirement certificate
Document explained
Confirm technical specification with professional or funding service.
- Requirement
- Required when applicable
- Submission format
- Clarify format with the service
- Translation
- No specific rule recorded; clarify foreign-language records with the service.
- Authentication
- No specific rule recorded; clarify need before obtaining records.
- Recency
- No fixed age limit recorded; clarify currency with the service.
SourceSchall-/Wärmeschutzfenster: Förderantrag
Schall-/Wärmeschutzfenster: FörderantragStadt Wien · MA 50 · retrieved on 11/10/2026
Open original source
In detail
Prepare appropriate cost records and professional certificates
Privately organise actual professional quote or invoice and minimum-requirement certificate, with no duplicate invoice requirement during planning. Review evidence form with the service.
SourceSchall-/Wärmeschutzfenster: Förderantrag
Schall-/Wärmeschutzfenster: FörderantragStadt Wien · MA 50 · retrieved on 11/10/2026
Open original sourceSubmit your applicationHere you submit your application. Submitting means you hand it in officially.Key step
- Why?
- Only then can MA 50 check your application.
- What you do
- Send the form and proof the agreed way. The preparation is not yet a promise or a payment.
- Where?
- MA 50Directly with the named service
In detail
Prepare your confirmed window-funding application
Personally file the actually agreed form and records through the confirmed official channel. Preparation is no assurance, building legality or payout.
SourceSchall-/Wärmeschutzfenster: Förderantrag
Schall-/Wärmeschutzfenster: FörderantragStadt Wien · MA 50 · retrieved on 11/10/2026
Open original sourcePrepare the final statementThe final settlement comes after the work. Then the funding amount is worked out.Key step
- Why?
- It is best to place orders only after the assurance. MA 25 checks the work. MA 50 does the settlement.
- What you do
- Read the conditions of the assurance carefully. Check that the work fits. The app does not guarantee a payment.
- Where?
- MA 50 / MA 25Directly with the named service
In detail
Review actual assurance and final-settlement route
Directly review assurance conditions, actual professional execution and final settlement. General construction or settlement guidance recommends contracts only after assurance; MA 25 reviews execution and MA 50 settles. No payout guarantee or contract placed by the app.
SourceWohnungsverbesserung: Bau und Abrechnung
Wohnungsverbesserung: Bau und AbrechnungStadt Wien · MA 50/MA 25 · retrieved on 11/10/2026
Open original source
Depending on your situation, this is added
- Check if you must report building work
- Choose a quote or an invoice
- Get the right form
- Choose how to send the application
- Plan the costs of the windows
- Follow your application
- Send missing receipts
Frequently asked questions
Can I do this online?
6 of 14 possible steps mention an online channel in their text. Requirements are in the official source.
What does it cost?
No costs are recorded for these steps in the linked sources. Fees may still apply.
Do I need an einfach.wien account?
No. The plan works without registration; answers stay in your browser.
Does einfach.wien submit my application?
No. einfach.wien helps you prepare and links official channels. You submit applications yourself to the responsible service.
What this page is based on
The information is based on official sources. einfach.wien is a private project; the content has not been professionally reviewed. All information without guarantee, no legal advice. The responsible office is always authoritative.
SourceSchall-/Wärmeschutzfenster: Förderantrag
Stadt Wien · MA 50 · retrieved on 11/10/2026
Open original sourceSourceSanierungs- und Dekarbonisierungsverordnung: relevanter § 18
RIS · Wiener Landesrecht · retrieved on 11/10/2026
Open original sourceSourceWohnungsverbesserung: Vermietererklärung
Stadt Wien · MA 50 · retrieved on 11/10/2026
Open original sourceSourceWohnungsverbesserung: aktuell verlinkter Antrag
Stadt Wien · MA 50 · retrieved on 11/10/2026
Open original sourceSourceWohnungsverbesserung: Bau und Abrechnung
Stadt Wien · MA 50/MA 25 · retrieved on 11/10/2026
Open original source